Installation process

Installation process (Korea Hydro & Nuclear Power Co., LTD, Uljin Hydro & Nuclear Headquarter)

  • 1. Reserved land for installation

    1. Reserved land for installation

  • 2. Basic excavation

    2. Basic excavation

  • 3. Basic compaction

    3. Basic compaction

  • 4. Basic rubble laying

    4. Basic rubble laying

  • 5. Basic concrete placing

    5. Basic concrete placing

  • 6. Floor steel reinforcement placing

    6. Floor steel reinforcement placing

  • 7. Floor double grid-type placing

    7. Floor double grid-type placing

  • 8. Floor concrete placing

    8. Floor concrete placing

  • 9. Wall, load cell support grid-type     placing

    9. Wall, load cell support grid-type
    placing

  • 10. Wall concrete placing

    10. Wall concrete placing

  • 11. Truck scale substructure ①

    11. Truck scale substructure ①

  • 12. Truck scale substructure ②

    12. Truck scale substructure ②

  • 13. Truck scale assembly ①

    13. Truck scale assembly ①

  • 14. Truck scale assembly ②

    14. Truck scale assembly ②

  • 15. Load cell installation

    15. Load cell installation

  • 16. Summing box installation

    16. Summing box installation

  • 17. Truck scale upper plate assembly

    17. Truck scale upper plate assembly

  • 18. External indicator installation

    18. External indicator installation

  • 19. Weight adjustment (Calibration)

    19. Weight adjustment (Calibration)

  • 20. Weight adjustment (Calibration)

    20. Weight adjustment (Calibration)

  • 21. Indicator installation

    21. Indicator installation

  • 22. Weight PC system installation

    22. Weight PC system installation

  • 23. Truck scale installation complete

    23. Truck scale installation complete

  • 24. Calibration certificate

    24. Calibration certificate